Jiangyin Glitter Air Treatment Equipment Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Zhang Jack
  • Company Name : Jiangyin Glitter Air Treatment Equipment Co., Ltd.
  • Tel : 86-510-86608300,86601171
  • Fax : 86-510-86606917
  • Address : Jiangsu,Jiangyin,No.2512, Zhencheng Road, Xishiqiao,Ligang,Lingang New City,Jiangyin
  • Country/Region : China
  • Zip : 214441

evaporative cooling pad making machine

evaporative cooling pad making machine
Product Detailed
Related Categories:Other Machinery
Inchuding all equipments to produce different size cooling pad

Cooling  Pad  Production  Line  Quotation  Sheet

1.Resin Machine---1 set  ( The first step machine to pour glue)

2. Cutting Machine---1 set (The machine can cut the paper)

3. Corrugating Machine---2 sets (pls choose one from the three combinations, 7090 & 5090, 7090 & 6090, 6090 & 5090)

(The machine can make the paper into corrugated shape)

4. Heating & Forming Machine---1 set

(The machine can heat the first step glue and shape the corrugation) 

5. Gluing Machine---1 set  

( The second step to put on glue, connecting worktable and elevator)

6. Elevator---1 set ( transit the corrugation paper)

7. Oven/ Solidifying Machine  1set  

(The machine heat and dry the second step glue and solidify the corrugated paper) 

8. Sawing Machine   1 set 

8. Electrical Cabinet  3 nos.(2 large & 1 small)  

(The whole supplying power system of all production line)

9. Control Box   1 set 

10. Glue Formula    

                

11. Production Technology

Total:USD79400//RMB500220(The whole equipment)

)

Pls Notice :

1) All quotation above is on FOB shanghai port

2) Payment : 30% advanced deposit,70% balance T/T before the shipment.

3) Leading Time : 75 days after receiving 30% advanced deposit.

4) All commission rates at buyer's site,such as visa 

charge,doulbe-flight tickets,accommondation charge,communication charge, working allowance...etc...are all for buyer's account.

5) If including the installation fee, then the total price will be USD81710($55/day/person for the installation fee). We’ll arrange for 2 technicians to give u about 03 weeks of equipment installation, during the time, they will also give yr workers about 01 week training.(Pls notice: the installation & time must be on the condition that u have been ready for all the raw materials, such as glues, paper,workers, electric and so on. Also, this quotation isn’t including the double-flight tickets, hotel & foods fee)

OEM service is available.

evaporative cooling pad making machine



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.